STARBEK, Marko ;GRUM, Janez ;KUŠAR, Janez . Realistic Lead Times of Operations and Efficiency of the PPC System. Strojniški vestnik - Journal of Mechanical Engineering, [S.l.], v. 48, n.2, p. 98-111, july 2017. ISSN 0039-2480. Available at: <https://www.sv-jme.eu/article/realistic-lead-times-of-operations-and-efficiency-of-the-ppc-system/>. Date accessed: 01 dec. 2024. doi:http://dx.doi.org/.
Starbek, M., Grum, J., & Kušar, J. (2002). Realistic Lead Times of Operations and Efficiency of the PPC System. Strojniški vestnik - Journal of Mechanical Engineering, 48(2), 98-111. doi:http://dx.doi.org/
@article{., author = {Marko Starbek and Janez Grum and Janez Kušar}, title = {Realistic Lead Times of Operations and Efficiency of the PPC System}, journal = {Strojniški vestnik - Journal of Mechanical Engineering}, volume = {48}, number = {2}, year = {2002}, keywords = {PPC-systems; lead times; funnel models; flow diagrams; }, abstract = {The practical efficiency of commercially available PPC (production planning and control) systems [1] and [2] depends to a great extent on the implementation of operations lead times determination which is based on estimated or calculated lead times of workplaces. This paper presents a method for calculating the average lead times of workplaces. The average lead times of workplaces, found in the interval P, gives a realistic picture of the order flow through workplaces, and these data are the basis for the implementation of the realistic operations lead times determination in the next (P+1) interval. With the proposed method for calculating lead times a transition from static to dynamic orders lead times determination is accomplished.}, issn = {0039-2480}, pages = {98-111}, doi = {}, url = {https://www.sv-jme.eu/article/realistic-lead-times-of-operations-and-efficiency-of-the-ppc-system/} }
Starbek, M.,Grum, J.,Kušar, J. 2002 July 48. Realistic Lead Times of Operations and Efficiency of the PPC System. Strojniški vestnik - Journal of Mechanical Engineering. [Online] 48:2
%A Starbek, Marko %A Grum, Janez %A Kušar, Janez %D 2002 %T Realistic Lead Times of Operations and Efficiency of the PPC System %B 2002 %9 PPC-systems; lead times; funnel models; flow diagrams; %! Realistic Lead Times of Operations and Efficiency of the PPC System %K PPC-systems; lead times; funnel models; flow diagrams; %X The practical efficiency of commercially available PPC (production planning and control) systems [1] and [2] depends to a great extent on the implementation of operations lead times determination which is based on estimated or calculated lead times of workplaces. This paper presents a method for calculating the average lead times of workplaces. The average lead times of workplaces, found in the interval P, gives a realistic picture of the order flow through workplaces, and these data are the basis for the implementation of the realistic operations lead times determination in the next (P+1) interval. With the proposed method for calculating lead times a transition from static to dynamic orders lead times determination is accomplished. %U https://www.sv-jme.eu/article/realistic-lead-times-of-operations-and-efficiency-of-the-ppc-system/ %0 Journal Article %R %& 98 %P 14 %J Strojniški vestnik - Journal of Mechanical Engineering %V 48 %N 2 %@ 0039-2480 %8 2017-07-07 %7 2017-07-07
Starbek, Marko, Janez Grum, & Janez Kušar. "Realistic Lead Times of Operations and Efficiency of the PPC System." Strojniški vestnik - Journal of Mechanical Engineering [Online], 48.2 (2002): 98-111. Web. 01 Dec. 2024
TY - JOUR AU - Starbek, Marko AU - Grum, Janez AU - Kušar, Janez PY - 2002 TI - Realistic Lead Times of Operations and Efficiency of the PPC System JF - Strojniški vestnik - Journal of Mechanical Engineering DO - KW - PPC-systems; lead times; funnel models; flow diagrams; N2 - The practical efficiency of commercially available PPC (production planning and control) systems [1] and [2] depends to a great extent on the implementation of operations lead times determination which is based on estimated or calculated lead times of workplaces. This paper presents a method for calculating the average lead times of workplaces. The average lead times of workplaces, found in the interval P, gives a realistic picture of the order flow through workplaces, and these data are the basis for the implementation of the realistic operations lead times determination in the next (P+1) interval. With the proposed method for calculating lead times a transition from static to dynamic orders lead times determination is accomplished. UR - https://www.sv-jme.eu/article/realistic-lead-times-of-operations-and-efficiency-of-the-ppc-system/
@article{{}{.}, author = {Starbek, M., Grum, J., Kušar, J.}, title = {Realistic Lead Times of Operations and Efficiency of the PPC System}, journal = {Strojniški vestnik - Journal of Mechanical Engineering}, volume = {48}, number = {2}, year = {2002}, doi = {}, url = {https://www.sv-jme.eu/article/realistic-lead-times-of-operations-and-efficiency-of-the-ppc-system/} }
TY - JOUR AU - Starbek, Marko AU - Grum, Janez AU - Kušar, Janez PY - 2017/07/07 TI - Realistic Lead Times of Operations and Efficiency of the PPC System JF - Strojniški vestnik - Journal of Mechanical Engineering; Vol 48, No 2 (2002): Strojniški vestnik - Journal of Mechanical Engineering DO - KW - PPC-systems, lead times, funnel models, flow diagrams, N2 - The practical efficiency of commercially available PPC (production planning and control) systems [1] and [2] depends to a great extent on the implementation of operations lead times determination which is based on estimated or calculated lead times of workplaces. This paper presents a method for calculating the average lead times of workplaces. The average lead times of workplaces, found in the interval P, gives a realistic picture of the order flow through workplaces, and these data are the basis for the implementation of the realistic operations lead times determination in the next (P+1) interval. With the proposed method for calculating lead times a transition from static to dynamic orders lead times determination is accomplished. UR - https://www.sv-jme.eu/article/realistic-lead-times-of-operations-and-efficiency-of-the-ppc-system/
Starbek, Marko, Grum, Janez, AND Kušar, Janez. "Realistic Lead Times of Operations and Efficiency of the PPC System" Strojniški vestnik - Journal of Mechanical Engineering [Online], Volume 48 Number 2 (07 July 2017)
Strojniški vestnik - Journal of Mechanical Engineering 48(2002)2, 98-111
© The Authors, CC-BY 4.0 Int. Change in copyright policy from 2022, Jan 1st.
The practical efficiency of commercially available PPC (production planning and control) systems [1] and [2] depends to a great extent on the implementation of operations lead times determination which is based on estimated or calculated lead times of workplaces. This paper presents a method for calculating the average lead times of workplaces. The average lead times of workplaces, found in the interval P, gives a realistic picture of the order flow through workplaces, and these data are the basis for the implementation of the realistic operations lead times determination in the next (P+1) interval. With the proposed method for calculating lead times a transition from static to dynamic orders lead times determination is accomplished.